Example Industries Where Allen Watson Ltd Works

Click on each industry heading or arrow to show project details.

Utilities and Communications

  • Contractor:Morrison Construction Services
  • Project: River Medway Crossings at Cuxton and Halling in Kent
  • Scope: Installation of 273mm Ø Steel and 225mm Ø PE pipe each 850m long. Installation of 219mm Ø Steel and 180mm Ø PE pipe each 500m long
  • Contractor: Morgan Est Utilities
  • Project: Sutton Hall Farm, Macclesfield
  • Scope: Supply and installation of 60 metres of 400mmØ clay gravity drainage pipe in firm to stiff silty, sandy, gravelly clay using guided auger boring equipment
  • Contractor: Balfour Beatty Utilities Limited
  • Project: Exeter Link Main
  • Scope: Installation of 406mm and 219mm OD steel sleeves for 660 metres using our maxi horizontal directional drilling equipment

Transport Networks – Rail, Road and Air

  • Contractor: Costain Limited
  • Contract: M4 widening J.5 to J.7 Maidenhead
  • Scope: Installation of 28 x 323mm steel sleeves and sub-ducts under live carriageway using a variety of methods including guided auger boring, pipe ramming and HDD
  • Contractor: BAM Nuttall Ltd
  • Contract: Bentley Station – Under track crossing
  • Scope: Supply and installation of a 525mm ID gravity sewer pipe for a distance of 25 metres under a live railway using our guided auger boring equipment
  • Contractor: Dyer & Butler Limited
  • Contract: Gatwick Airport Term Contract
  • Scope: Installation of a 160mm OD PE water main beneath a taxiway 50 metres in length using our horizontal directional drilling equipment
  • Contractor: Story Rail Ltd
  • Contract: Under track crossing adjacent to Rugby Golf Club
  • Scope: Supply and installation of 26 metres of 450mm ID gravity sewer pipe using our guided auger boring equipment

Pipeline Engineering and Petro-chemical

  • Contractor: Biwater Graham Joint Venture
  • Project: North Coast WWTW at Riversdale and Ballycairn, NI
  • Scope: Installation of two 400mmØ and two 560mmØ PE pipes in rock formation with each bore 420 metres long across the River Bann
  • Contractor: Murphy Pipelines Limited
  • Contract: Winnington Gas Pipeline project
  • Scope: Crossing of the River Weaver with 323mmØ steel gas pipe, 540 metres in length using midi track mounted directional drilling equipment
  • Contractor: AMEC Utilities Limited
  • Contract: Hatfield Moors Gas Pipeline project
  • Scope: Crossing of River Torn with twin 323mmØ & 500mmØ steel gas pipe, 360 metres in length using horizontal directional drilling equipment

Defence and Security

  • Contractor: Allens Fencing Limited
  • Contract: Exxon Mobil Oil Refinery, Fawley – Trenchless Duct Crossings
  • Scope: Installation of 110mm OD red SDR17 PE ducts in multiple road crossings inside the Fawley tank farm and oil refinery
  • Contractor: Bluestone Plc/Ministry of Defence
  • Contract: Air Traffic Control Centre, RNAS Yeovilton
  • Scope: Crossing runway and taxiways with twin bores 470 metres in length each with 5 x 110mm OD black SDR11 PE ducts using directional drilling equipment

Construction and Civil Engineering

  • Contractor: Walker Construction (UK) Limited
  • Contract: Sussex University - Guided Auger Bore Installation
  • Scope: Installation of a 610mm OD steel sleeve for a distance of 48 metres using our guided auger boring equipment
  • Contractor: J Browne Civil Engineering Limited
  • Contract: 22 Southwood Lane, Highgate
  • Scope: Supply and Installation of 25m of 300mm ID gravity clay drainage pipe 6m deep in wet clay between buildings using our guided auger boring equipment
  • Contractor: Jackson Civil Engineering Ltd
  • Contract: Lowestoft Rising Main
  • Scope: Installation of 315mmØ, 800mmØ & 900mmØ PE pipes in lengths 1,044 metres beneath a leisure park, railway and woodland area using maxi horizontal drill rig

Local Authorities

  • Contractor: Chichester District Council
  • Contract: Trenchless Drainage – St Martins Development, Chichester
  • Scope: Supply and Installation of a 150mm ID gravity clay drainage pipe for a distance of 28 metres using our guided auger boring equipment

Consultants

  • Contractor: Hyder Consulting Limited
  • Contract: Cardiff Ground Water Control
  • Scope: Multiple 314m lengths of 250mmØ horizontal collector drains for ground water removal installed using horizontal directional drilling equipment

Electrical Contractors and Authorities

  • Contractor: Scottish & Southern Energy Plc
  • Contract: Hayling Island dual 33Kv cable replacement scheme
  • Scope: Supply and installation of four 219mmØ steel sleeves each 700m long using our maxi horizontal directional drilling equipment under Langstone Harbour
  • Contractor: McNicholas Construction Services Limited
  • Contract: Rhyl Flats Wind Farm under track crossing
  • Scope: Installation of three 355mm OD PE pipes each 65m in length under a live railway with our midi horizontal directional drill equipment

River and Waterway Authorities

  • Contractor: Middle Fen & Mere Internal Drainage Board
  • Contract: East Fen Drove, Soham – Trenchless Road Crossing
  • Scope: Installation of a 323mm OD steel sleeve, 16m in length using our auger equipment for a new flood alleviation project
  • Contractor: Watermark (Yorkshire Water/MWH Alliance)
  • Contract: A630 Sheffield Parkway Mains Replacement.
  • Scope: Supply and installation of 125mm and 180mm OD PE pipes in 95m lengths beneath carriageway in weak mudstone/sandstone using mini horizontal directional drilling equipment

Developers

  • Contractor: Barratt Homes Limited
  • Contract: Southampton Road, Lymington drainage installation
  • Scope: Supply and installation of a 150mm ID gravity clay drainage pipe for a distance of 52m using our guided auger boring equipment